1.
Abduh M, Soemardi BW, Wirahadikusumah RD. Indonesian construction supply chains cost structure and factors: a case study of two projects. JCEM [Internet]. 2012Apr.2 [cited 2024Nov.15];18(2):209-16. Available from: https://mma.vgtu.lt/index.php/JCEM/article/view/4444