[1]
Polat, G. 2016. Subcontractor selection using the integration of the AHP and PROMRTHEE methods. Journal of Civil Engineering and Management. 22, 8 (Nov. 2016), 1042-1054. DOI:https://doi.org/10.3846/13923730.2014.948910.