Vol 15 No 4 (2009)
Published: 2009-12-31
Articles
The time‐cost trade‐off analysis in construction project using computer simulation and interactive procedure
Abstract 593 | PDF Downloads 332 | DOI https://doi.org/10.3846/1392-8619.2009.15.523-539
Page 523-539
Multiskilling in construction ‐ a strategy for stable employment
Abstract 613 | PDF Downloads 363 | DOI https://doi.org/10.3846/1392-8619.2009.15.540-560
Page 540-560
The contribution of optimal turbo fan transport aircraft climb schedule to air company economy
Abstract 463 | PDF Downloads 296 | DOI https://doi.org/10.3846/1392-8619.2009.15.561-579
Page 561-579
The analysis of the quality of the results obtained with the methods of multi‐criteria decisions
Abstract 553 | PDF Downloads 317 | DOI https://doi.org/10.3846/1392-8619.2009.15.580-592
Page 580-592
Multi‐attribute analysis for the eco‐energetic assessment of the building life cycle
Abstract 626 | PDF Downloads 333 | DOI https://doi.org/10.3846/1392-8619.2009.15.593-611
Page 593-611
Multicriterial sustainability assessment of residential buildings
Abstract 755 | PDF Downloads 404 | DOI https://doi.org/10.3846/1392-8619.2009.15.612-630
Page 612-630
Service quality gaps and their role in service enterprises development
Abstract 931 | PDF Downloads 452 | DOI https://doi.org/10.3846/1392-8619.2009.15.631-645
Page 631-645
Fuzzy real options valuation for oil investments
Abstract 624 | PDF Downloads 403 | DOI https://doi.org/10.3846/1392-8619.2009.15.646-669
Page 646-669